Project information
Grid connection study of an Ignis´s H2 production project in Toledo
October 2025 - December 2025
Funding entity Ignis Energia S.L.
The aim of this work is a feasibility study of the connection to the grid of an Ignis's H2 production project in Toledo.
Research topics:
- Steady-state: Load flows, analysis of power system constraints, optimal load flows, voltage control ancilliary service,short-circuits, protections in transmission and ditribution networks